usdt公开api接口(www.trc20.vip)_DNeX unit takes delivery of FPSO from Teekay
,DNeX group managing director Tan Sri Syed Zainal Abidin Syed Mohamed Tahir said the group anticipates full operational deployment of the FPSO on the Avalon field development project in the North Sea by 2025.usdt公开api接口(www.trc20.vip)是使用TRC-20协议的Usdt第三方支付平台,Usdt收款平台、Usdt自动充提平台。免费提供入金通道、Usdt钱包支付接口、Usdt自动充值接口、Usdt寄售回收。菜宝Usdt钱包一键生成Usdt钱包、一键调用API接口、一键出售Usdt。
PETALING JAYA: Dagang Nexchange Bhd’s (DNeX) subsidiary Ping Petroleum UK PLC has taken delivery of the Sevan Hummingbird floating production, storage and offloading (FPSO) vessel from marine energy transportation company, Teekay Corp.
DNeX group managing director Tan Sri Syed Zainal Abidin Syed Mohamed Tahir said the group anticipates full operational deployment of the FPSO on the Avalon field development project in the North Sea by 2025.
“We have a tangible asset ready with the newly acquired Sevan Hummingbird. Our next step is to secure approval for our field development plan, which will be submitted in the coming months,” he said yesterday.
Ping has received a “no objection” letter from the North Sea Transition Authority in March and was then granted a 19-month extension from the authority to the second term of the P2006 licence containing the Avalon field.
“The proposed development concept includes plans to deploy the Sevan Hummingbird FPSO at the Avalon field which will be modified to facilitate electrification from an external, low-carbon source,” DNeX said.
Ping is also evaluating options to connect the FPSO to a dedicated floating offshore wind turbine to power the facility which will help minimise diesel usage and associated greenhouse gas emissions.
The planned development allows Ping to expand and diversify its portfolio of producing assets in full compliance with the United Kingdom’s energy security and net-zero targets.
Commissioned in 2008, the Sevan Hummingbird FPSO is a 60 metre-diameter facility with a storage capacity of 270,000 barrels of oil and is capable of producing up to 30,000 barrels of oil per day, supporting up to 47 offshore personnel.
With a total estimated ultimate recovery of 23 million barrels of oil reserves over a period of 12 years, oil production from Avalon, Ping’s second oilfield asset, is expected to come onstream in 2025.
转载说明:本文转载自Sunbet。
网友评论
皇冠最新登录(www.hg108.vip)
回复拜登在会议中表示,联邦政府将尽力保护禁止堕胎的州内想要寻求堕胎药品或者需要到其他州才能进行堕胎的女性。未来前途光明啊
胜负彩开奖(www.99cx.vip)
回复期待期待,听说很好
彩客网(www.99cx.vip)
回复Sabah police commissioner Idris Abdullah said the curfew from 6pm to 6am was enforced in the waters of Beluran, Sandakan, Kinabatangan, Lahad Datu, Kunak, Semporna and Tawau.符合我审美
我是精神病人@
回复@彩客网(www.99cx.vip) 真心实意推荐了
哈希竞彩游戏源码
回复@彩客网(www.99cx.vip) 维持头皮清洁 保障毛干所需养分建议用心读